• 03 – 4040 0040
    general@cream.my

  • Construction Research Institute of Malaysia (CREAM)
    Level 29, Sunway Putra Tower, No 100, Jalan Putra, 50350 Kuala Lumpur, Malaysia.

News

28 May 2018

Public Training / Workshop / Public Seminar on Ready-mixed Concrete

(0 votes)

INTRODUCTION

 

The CIDB Act 520 (Amendment 2011) has authorised Lembaga Pembangunan Industri Pembinaan Malaysia (CIDB) to enforce and regulate the construction products as per Section 33C (1), Section 33D (1) and Section 33D (2). All construction materials/products listed in the Fourth Schedule of Act 520 (Amendment 2011) are required to obtain CIDB’s Certificate of Standards Compliance or “Perakuan Pematuhan Standard” (PPS). Ready-Mixed Concrete is already included in the Fourth Schedule.

As stated in the Fourth Schedule, ready-mixed concrete must comply with the Construction Industry Standard 21 (CIS 21) and the Malaysian Standards MS 523: Part 1, Part 2 and Part 3. MS 523: Part 1 is now being replaced by MS EN 206:2016. The scope of CIS 21:2016 is for ready-mixed concrete produced by any ready-mixed concrete plants producing concrete for structural and non-structural use, including those used in casting of precast concrete products.

CREAM Certification Service (CCS) is already providing product certification for ready-mixed concrete. It was started as a pilot scheme during the development and drafting stage of CIS 21. CCS is recognized by CIDB and has successfully issued Product Certificate of Conformity to some successful ready-mixed concrete producers and concrete product pre-casters. With experience gained, CCS intends through this program to explain and highlights the requirements of the standards specified in Fourth Schedule for the better understanding by the ready-mixed concrete producers and concrete product pre-casters.

 

AIM & OBJECTIVES

 

The main objective of this program are : -

1. Understanding and appreciation of the requirements of CIS 21:2016, MS 523-2:2017, MS 523-3:2017 & MS EN 206:2016.

2. Focussing and fundamental requirements on production control, conformity control and conformity criteria to engineer, regulator, consultant, contractor, and producer.

3. For producer upon completing this program, the participants could proceed to establish the production control system manual, control procedures and to perform conformity control and to maintain them.


For more info, please download the registration form and guideline here.

 

Read 767 times Last modified on Monday, 28 May 2018 17:01

WRITE A COMMENT

Please do not hesitate to contact us if you have any enquiry:

  •  

    +60(03) 4040 0040
  •  

    +60(03) 4050 2649
  •  

    general@cream.my


"Make CREAM your partner in R&D"

Latest News